April 2015

 

 

Mobile Pipe Coating Workshop

 

 

rubb manufacturing buildings

 

 


 

 

rubb construction buildings

Rubb Building Systems provides flexibility to meet ever changing production requirements.

 

At Bredero Shaw’s pipe coating manufacturing plant at Nongsa Port, Batam Island, Rubb has delivered a relocatable pipe coating building which houses Bredero Shaw’s latest pipe coating technology.

 

The building was ordered in December 2013, and installation took a few short weeks during April and May. With a width of 12 meters and a length of 90 meters, the building resembles a large tunnel, protecting equipment and operators from the heavy rains and strong sun prevalent in the tropics.

 

Normally the entire installation would take less than two weeks to complete, however at the client's request the PVC assembly was paused so the heavy production equipment could be put in place after the frames were assembled.

Subsribe to Rubb SG news

 

 

Share this news.


share news story on facebook share news story on twitter